2023-05-04: REGARDING EMD ---(If any query regarding WB E-Tendering kindly contact)- sumi.chakraborty@ext.icicibank.com ( 8017094744), sona.banerjee@ext.icicibank.com ( 9836547320) Note: Kindly call between the Official timings:-- From 10am to 4pm, JAYANTA KUMAR (Manager at ICICI Bank-Commercial Banking, URGENT CALL ONLY) - 8336917932 |
F Year | NIQ No | NIQ Date | Work Order No | Work Order Date | Work Order Amount | Work Name | Starting Date & Completion Date | Block Attached | Physical Achievement | Financial Achievement | No. of Beneficiary / inhabitant got benefitted under the scheme | Funding Department / Executing Agency | Current Status of the work |
2019-20 | 0000-00-00 | 0000-00-00 | Construction of road protective wall from Betberia culvert towards Dakshinpara Masjid at Chaitanyapur-I G.P under Beldanga-I Block | 21.11.19 | Beldanga-I | Work in Progress | 19.32008 | 1900 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of road sid drain from Jalal Mondal's house towards Gajlu Rahaman house at Kapasdanga G.P under under Beldanga-I Block | 09.12.19 | Beldanga-I | Work in Progress | 7.09414 | 1000 | ZP | Completed | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of Guardwall of Moshimpur Pakurtala under Beldanga-II Block | 28.11.19 | Beldanga-II | Work in Progress | 14.56873 | 1450 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Alimuddin Molla house towards Echanobi Sk house via NH-34 under Rampara-II G.P in Beldanga-II Block | 06.11.19 | Beldanga-II | Work in Progress | 17.40153 | 1900 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Costruction of concrete road from Biswanath Hazra house to Badsahi road under Bhakuri-I G.P in Berhampore Block | 15.11.19 | Berhampore | Work in Progress | 17.12045 | 1800 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of black top road from Lokpur more to Sahajadpur Uttarpara Masjid under Sahajadpur G.P in Berhampore Block | 21.11.19 | Berhampore | Work in Progress | 17.12045 | 1650 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Reparing of black top road from Hatinagar Bakultala via Amed Ali Mondal house towards Joynuddin Sk house (Hikampur) via Ustia under Hatinagar G.P in Berhampore Block | 21.11.19 | Berhampore | Work in Progress | 22.54053 | 2150 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Malipara Pry.School via Tulsipur Malipara under Dhulari G.P in Domkal Block | 17.10.19 | Domkal | 100% | 16.50904 | 1800 | ZP | Completed | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Mahespur Ghat to Pachim Daud LCS house under Mahespur G.P in Farakka Block | 23.12.19 | Farakka | Work in Progress | 15.19457 | 1500 | ZP | Ongoing | |||
2019-20 | 20/19-20,Sl-10 | 0005-11-19 | 0000-00-00 | Construction of cc road with guardwall from Santosh Das house to Sambhu Charan Das house in Aliapur village Amtala under Imamnagar G.P in Farakka Block | 10.01.2020 | Farakka | Work in Progress | 19.52504 | 1500 | ZP | Ongoing | ||
2019-20 | 26/19-20,Sl-04 | 2024-12-19 | 0000-00-00 | Construction of concrete culvert at Nista Bahadi nagar,Mouza-Nista,Plot No-149 under Jarur G.P in R-Ganj-I block | 04.03.20 | Raghunathganj-I | Work in Progress | 18.15396 | 2200 | ZP | Ongoing | ||
2019-20 | 20/19-20,Sl-30 | 0005-11-19 | 0000-00-00 | 08.02.20 & 31.03.20 | Raghunathganj-I | 100% | 12.29883 | 1900 | ZP | Completed | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of Guard wall from Eserpara Jumma Masjid to Chand Mahammad house pond side mouza-Islampur ,Jl.No-58 Dag No-3308/3294 under Chak Islampur G.P in Raninaga-I Block | 09.12.19 | Raninaga-I | Work in Progress | 16.74643 | 1800 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Masjid side Alamgir Kabir house to Khursed Mawlana deep vill-Karaiya J.L No-50 in Sagardighi Block | 15.11.19 | Sagardighi | Work in Progress | 16.21719 | 1600 | ZP | Ongoing | |||
2019-20 | 0000-00-00 | 0000-00-00 | Construction of road from Pakur rasta towards Basir Sekh Godown under Tinapkuria G.P in Samserganj Block | 24.12.19 | Samserganj | Work in Progress | 14.39335 | 1500 | ZP | Ongoing | |||
2019-20 | 13/19-20,Sl-01 | 2027-09-19 | 0000-00-00 | Imp. Of road with guard wall from Kankuria more to Ghoshpara NH-34 at Bogdadnagar G.P under Samserganj Block | 14/01/20 | Samserganj | Work in Progress | 25.62190 | 1650 | ZP | Ongoing | ||
2019-20 | 49/19-20,Sl-01 | 2013-03-20 | 0000-00-00 | Construction Guard wall with concrete road at the bank of masna River in front of the house of Asraful Hoque of vill-Madhya Antardwipa mouza-Antradwipa under Bhasaipaikar G.P in Samserganj Block | 14/05/20 | Samserganj | Work in Progress | 19.64684 | 1800 | ZP | Ongoing | ||
2019-20 | 49/19-20,Sl-15 | 2013-03-20 | 0000-00-00 | Construction of cement concrete road from Dakshin Chaksapur Primary School to Nasiruddin Sk house under Protapganj G.P in Samserganj Block | 02.06.20 | Samserganj | Work in Progress | 19.99290 | 2000 | ZP | Ongoing | ||
2019-20 | 24/19-20,Sl-02 | 2025-11-19 | 0000-00-00 | Construction of road from Amtalal KB road to Sukumar Mondal house with Hume Pipe culvert under Bahutali G.P in Suti-I Block | 04.03.20 | Suti-I | Work in Progress | 20.02240 | 2850 | ZP | Ongoing | ||
2019-20 | 20/19-20,Sl-12 | 0005-11-19 | 0000-00-00 | Construction of road from the Dailybazar towards the Matin Sk home at Ahiran village under Ahiran G.P in Suti-I Block | 07.04.20 | Suti-I | Work in Progress | 27.12746 | 3200 | ZP | Ongoing | ||
2019-20 | 13/19-20,Sl-02 | 0009-08-19 | 0000-00-00 | Construction of cement concrete raod with guard wall from Morjem house to Amir Sk house at Bahogalpur Dakhinpara under Umrapur G.p in Suri-II Block | 21.01.20 | Suti-II | Work in Progress | 19.99496 | 1800 | ZP | Ongoing | ||
2019-20 | 13/19-20,Sl-16 | 0009-08-19 | 0000-00-00 | Construction of concrete road with guard wall from Mohabul Sk house to Gopal Singha house under Jogtai-I G.P Suti-II Block | 15.11.19 | Suti-II | Work in Progress | 9.98684 | 1650 | ZP | Ongoing | ||
2019-20 | 20/19-20,Sl-05 | 0005-11-19 | 0000-00-00 | Construction of concrete road with guard wall from P.W.D road to Mala Mondal house under Jogtai-I G.P Suti-II Block | 10.01.20 & 15.02.20 | Suti-II | 100% | 6.28949 | 1250 | ZP | Completed | ||
2019-20 | 26/19-20,Sl-03 | 2024-12-19 | 0000-00-00 | Construction of cement concrete road with boulder sausage guard wall from Sahajadpur Kabarsthan to Kesu Sk house at Sahajadpur in Umrapur G.P in Suti-II Block | 18.03.20 | Suti-II | Work in Progress | 14.08100 | 1675 | ZP | Ongoing | ||
2019-20 | 36/19-20,Sl-02 | 0005-02-20 | 0000-00-00 | Construction of road from Poritosh house to NH-34 road under Jogtai-G.P in Suti-II Block | 14.05.20 | Suti-II | Work in Progress | 2812345 | 2650 | ZP | Ongoing | ||
2019-20 | 26/19-20,Sl-25 | 2024-12-19 | 0000-00-00 | Construction of road from Ajijul Sk's house towards Sultan Mahalder house with guard wall ,JL.No-63,Plot No-311 under Bajitpur G.P in Suti-II Block | 04.02.20 | Suti-II | Work in Progress | 19.13177 | 2200 | ZP | Ongoing | ||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete appproach road within the premises of Sargachi Ramkrishna Mission under Beldanga-I Block | Beldanga-I | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from NH-34 Uttarpara more to Choto Basantatala Bridge at Uttarpara under Radharghat-I GP in Berhampore Block | Berhampore | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Trimohini more towards Asraul house at mouja Debipur under Kantanagar GP in Bhagawangola-I Block | 26.04.19 | Bhagawangola-I | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Sukhen Bhaskar house towards Alamgir' house at Charbabupur under Hanmanta nagar GP In B-Gola-I Block | 25.04.19 31.03.19 | Bhagawangola-I | 100% | 4.23922 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of Cememt concrete road from Sukh chand house towards Kali Mandir at Chainpara Mayakhana under Habaspur GP in Bhagawangola-I Block | 08.05.19 | Bhagawangola-I | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Juma Masjid towards Apel Doctor's house at Natun Habaspur village under Mahammadpur GP in Bhagawangola-I Block | 26.04.19 21.03.19 | Bhagawangola-I | 100% | 4.26986 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Badal SK's house to Naimul Mahaldar house dag No 971,972 at mouja Mahishasthali under B-Gola-I GP in B-Gola-I Block | 01.05.19 29.04.19 | Bhagawangola-I | 100% | 6.34294 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of 1.00 m Span Massonary Culvert & 55.00 m approach road at Sarfia High Madrassa Hostel Compound under Bhagawangola-I Block | Bhagawangola-I | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Bani Amin's house to Sajjad's house dag No 355,338 at mouja Ramna Gobora under Kuthirampur GP in B-Gola-I Block | 28.04.19 19.04.19 | Bhagawangola-II | 100% | 9.46225 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete Road from Benipur More towards Benipue Juma Masjid at Mouja Benipr JL No 12 under Akheriganj GP in B-Gola-II Block | 05.05.19 31.05.19 | Bhagawangola-II | 100% | 8.05984 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of Cement Concrete Road From Giasuddin house towards Jahir Sk house at Mouja Nasipur JL No 66 under Bhagwangola II GP in B-Gola-II Block | 06.05.19 30.04.19 | Bhagawangola-II | 100% | 7.36047 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Imprivement of Pithch Road from Barianagar Hut towards Fulpur Jafrabad More via Kamari under Baligram GP in B-Gola-II Block | 08.05.19 | Bhagawangola-II | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Sonarul Haji led towards Soharab house at Chak Saralpur village under Saralpur GP in Bhagawangola-II Block | 26.04.19 | Bhagawangola-II | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Durga mandir towards Sarba Mongola mandir at village Jhanjra under Padma Kandi GP in Khargram Block | Khargram | WIP | 0 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road Nishitbag Durgamandir to Rajkumar Sarkar house under Prasadpur GP in Msd-Jiaganj Block | Msd-Jiaganj | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concreter oad from Nasiruddin Land to Culvert at Adwaityanagar viilage of Bhasaipaikar GP under Samserganj Block | 20.04.19 04.04.19 | Samserganj | 100% | 12.19863 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC Road from KB Road to Sovarghat Juma Masjid under Harua GP in Suti-I Block | 08.05.19 06.05.18 | Suti-I | 100% | 14.26837 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Improvement of road from the house of Majarul Islam towards Nurpur GP in Suti-I Block | 05.05.19 03.05.19 | Suti-I | 100% | 8.07393 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Improvement of CC road from the house of Biswanath Das to Rail Line at Sadekpur under Sadekpur GP under Suti-I Block | 27.04.19 31.03.19 | Suti-I | 100% | 7.60581 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Amuha High School to Nagen Sardar house at village Sundarpur CC road with guard wall under Kashenagar GP in Suti-II Block | 27.04.19 17.04.19 | Suti-II | 100% | 14.97078 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Bablu Dutta's house to Old Thana more under Aurangabad GP in Suti-II Block | 27.04.19 | Suti-II | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Jamshed sk's house to Jahir SK's house under Jagtai II GP in Suti-II Block | 06.05.19 25.03.19 | Suti-II | 100% | 8.12859 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Kripanath Sarkar house to Hajipur Ferighat mouja Hajipur under Mahishail-II GP in Suti-II Block | 08.05.19 17.04.19 | Suti-II | 100% | 14.97128 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of pitch road from Akmal Hossain house to Serful house at Bhabta under Bhabta-I GP in Beldanga-I Block | 12.04.19 | Beldanga-I | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Ali Nagar Bansjhar towards Krishnendu Biswas land at Bhadur under Chaityanayapur GP in Beldanga-I Block | 05.05.19 14.05.19 | Beldanga-I | 100% | 8.30729 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Rameswarpur Mathpara Safikul Sk house towards Baka Sako under Bhabta-II GP in Beldanga-I Block | 01.05.19 29.04.19 | Beldanga-I | 100% | 8.13009 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Kajisha Pachimpara Serful Sk house towards Idgha under Begunbari GP in Beldanga-I Block | 27.04.19 14.06.19 | Beldanga-I | 100% | 9.97066 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete rroad From Ajijul house towards Kabarasthan (300 mt) mouja-Jalapur natunpara in Sujapur Kumarpur GP in Beldanga-I Block | 27.04.19 | Beldanga-I | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of Concrete Road From Dukhu Sk towards Anarul Sk house at Sayedpara dangapara in Sujapur Kumarpur GP in Beldanga-I Block | 01.05.19 22.05.19 | Beldanga-I | 100% | 8.20097 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Masimpur Kamnagar anchal Prvat Ghosh house house towards Mukti Das house under Kamnagar GP in Beldanga-II Block | 27.04.19 | Beldanga-II | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Ramnadadpur Daspara towards Janela Bewa house under Dadpur GP in Beldanga-II Block | 06.05.19 02.05.19 | Beldanga-II | 100% | 8.37392 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Dadai Sk house towards Jamiruddin Molla house under Kashipur GP in Beldanga-II Block | 27.04.19 26.04.19 | Beldanga-II | 100% | 9.98719 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Sahorab Sk's more towards Jalauddin house under Andulberia GP in Beldanga-II Block | 27.04.19 08.05.19 | Beldanga-II | 100% | 9.95361 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Jadav Ghosh house towards Apanjan Club mouza-Bidupara under Ramnagar Bachara GP in Beldanga-II Block | 06.05.19 | Beldanga-II | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Ramnagar Ferry Ghat to Ujjal Ghosh Sweet Shop under Ramnagar Bachara GP in Beldanga-II Block | 06.05.19 14.06.19 | Beldanga-II | 100% | 9.10521 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Do-Pukuria Sufal Mondal Land towards Saktipur pucca rasta side Rakhu Das land Dag No-57 & 532 under Sompara-II GP in Beldanga-II Block | 06.05.19 03.07.19 | Beldanga-II | 100% | 24.48011 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Do-Pukuria Sufal Mondal Land towards Saktipur pucca rasta side Rakhu Das land Dag No-57 & 532 under Sompara-II GP in Beldanga-II Block [part-B] | Beldanga-II | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concreter road from Bazarpara more Paul Traders & Bimal Tea shop back side towards Bazarpara Ganga Mandir via Zilla Parishad Gorabazar Ferry Ghat under Radharghat-I & II G.P in Berhampore Block | 25.04.19 24.04.19 | Berhampore | 100% | 19.96327 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Sunil Rajbanshi house towards Sanuar Sk house under Bhakuri-I G.P in Berhampore Block | 27.04.19 03.04.19 | Berhampore | 100% | 9.87715 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Babu Sk Tea Shop to Khijnat Sk house under Rajdharpara G.P in Berhampore Block | 27.04.19 17.04.19 | Berhampore | 100% | 9.93048 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Kalimohan Sarkar house via Hatinagar Srada Bidyapith towards Hatinagar GSFP school under Hatinagar G.P in Berhampore Block | 25.04.19 12.06.19 | Berhampore | 100% | 8.49562 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Sultanpur Najrul Sk house via Sahidul Sk house via Bhairab Durga Mandir under Gurudaspur G.P in Berhampore Block | 27.04.19 26.04.19 | Berhampore | 100% | 9.97742 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Zilla Parishad towards DTC Internal road Murshidabad Zilla Parishad office premises,Berhampore,Murshidabad | 08.05.19 | Berhampore | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Tarakpur Bakultala towards Gajdharpara under Manindranagar GP in Berhampore Block | Berhampore | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Protection work Eucalyptus bulla pilling work with drum sheet. Along some streaches of PMGSY road (WB/13-371) | 27.04.19 | Berhampore | 100% | 25.32476 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Badur Bagan Play ground to Manik Mondal house at Kujura village under Jajan GP in Bharatpur-I Block | 07.05.19 | Bharatpur-I | 100% | 13.5185 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Siyadat Sk house to Talgram pucca road under Talgram GP in Bharatpur-I Block | 06.05.19 02.05.19 | Bharatpur-I | 100% | 15.14217 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Awocha Pachimpara Dinabandhu Saha house to Amrit Mondal house via Narayan Saha house via Howragar pond side with drain under Salu GP in Bharatpur-II Block | 08.05.19 07.04.19 | Bharatpur-II | 100% | 7.95958 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Ujunia Swapan Sk house to Sisua Dhulu master house under Salar GP in Bharatpur-II Block | 08.05.19 | Bharatpur-II | 100% | 7.37886 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from PMGSY road to Tenya Dinnath Seba Ashram mouza-Tenya J.L.No-140 under Tenya Baiddyapur GP in Bharatpur-II Block | 27.04.19 07.04.19 | Bharatpur-II | 100% | 9.29775 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Chunsahar Masjid to Chilipara under Malihati GP in Bharatpur-II Block | 27.04.19 03.04.19 | Bharatpur-II | 100% | 9.0343 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Durga mandir towards Dhoba Pukur at village-Punca under Parulia G.P GP in Burwan Block | 01.05.19 26.03.19 | Burwan | 100% | 6.984 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete "BOX culvert near Nagar's mill village-Haribati under Kharjuna GP in Burwan Block | 06.05.19 | Burwan | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Akhsyb Mukherjee house towards Badda Pry.School under Kalyanpur-II GP in Burwan Block | 28.04.19 25.04.19 | Burwan | 100% | 8.8264 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of bituminous road from Raihat Pry.School towards Sodpur under Sahora GP in Burwan Block | Burwan | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Achorapara Ainal Sk house to Barkona Ghat under Panchthupi GP in Burwan Block | Burwan | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of guard wall with ghat from Sukhen Ghosh house to Utpal Sutradhar house at village Maliandi Tantipara in Sundarpur GP under Burwan Block | Burwan | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Radhakantapur School more to Jabbar house under Dhulauri GP in Domkal Block | Domkal | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Battala on PWD bituminous road near PHE at Bhagirathpur to the land of Panchu Mondal via Sluis gate under Bhagirathpur GP in Domkal Block | 06.05.19 03.05.19 | Domkal | 100% | 18.19092 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Rafej Mondal' hous to Saiful's house at Brindabanpur under Madhurkul GP in Domkal Block | 06.05.19 02.05.19 | Domkal | 100% | 14.36857 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Laskarpur SSk school to Sabdalpur Jal tank under Madhurkul GP in Domkal Block | 06.05.19 05.05.19 | Domkal | 100% | 6.65406 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Imp. Of road from Ansar SK house of Ferari More via Tildanga Station Mouja Tildanga under Bewa II GP in Farakka Block | 29.04.19 12.04.19 | Farakka | 100% | 19.97394 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Cont of CC Road Abu Taher House to Brahmangram ICDS Centre at Brahmangram Village under Nayansukh GP in Farakka Block | 05.05.19 28.03.19 | Farakka | 100% | 7.43395 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC Road from Humayun Sk house to Mojammel SK house at Kuligram and CC Road from Anowar Hossain House to Kalu Momin house via Kajem Momin house at Kuligram village under Nayansukh GP in Farakka Block | 08.05.19 | Farakka | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Cons of CC Road from Gopalnagar NH34 to Gopalnagar Primary School mouja Mahadeb nagar under Mahadebnagar GP in Farakka Block | 29.04.19 28.03.19 | Farakka | 100% | 15.68359 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of Guard wall from Balurmathpara RLI to Balurmathpara Durga Mandir under Khidirpur GP in Hariharpara Block | 02.05.19 | Hariharpara | 100% | 19.45147 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concreter road from Mojjamel Sk house towards Barkat Mondal house mouza-Rukunpur Dag No-100.8-1102/JL No-30 under Rukunpur GP in Hariharpara Block | 27.04.19 31.05.19 | Hariharpara | 100% | 9.80254 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Hossain Mondal house towards Sree Ram Roy house mouza-Pratappur ,JL No-27 village-Bisratganj under Rukunpur GP in Hariharpara Block | 27.04.19 | Hariharpara | 100% | 9.48604 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of guard wall from Shreepur Madhyapara Jr high School via Kalam Sk's house towards Shreepur Jumma Masjid under Choa GP in Hariharpara Block | 29.04.19 26.04.19 | Hariharpara | 100% | 19.12629 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Guardwall from Balurmathpara Durga Mandir under Khidirpur GP in Hariharpar Block | 06.05.19 02.05.19 | Hariharpara | 100% | 9.47322 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Hiren Choudhury's house to Dwijen Mondal's house at Khasmahal under Sahebnagar GP In Jalangi Block | 06.05.19 18.04.19 | Jalangi | 100% | 10.44744 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Azid Sk s/o Charu Mondal house to Tunuwara Khatun D/O Mecherruddin Sarkar mouza- Kazipara under Debipur GP In Jalangi Block | 06.05.19 | Jalangi | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from PWD road to Nurabul Mondal house mouza- Nachererpara Bilaspur under Sadhikhandiar GP in Jalangi Block | 06.05.19 | Jalangi | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Samsul Mandal house to Kaimuddin Sekh's house Under Jalangi GP in Jalangi Block | 06.05.19 | Jalangi | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Saiful Mandal house to Nurabul Mandal house under Ghoshpara GP in Jalangi Block | 06.05.19 17.04.19 | Jalangi | 100% | 7.05116 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Lawpukur to Sabostala Kobbersathsan at village Margram GP under Kahargram Block | Kahargram | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Kandi Panchuthpi pucca rasta near Bahara PHC to Bhandera Law pukur via Bhandera Ghoshpara at Jasohari Anukha-II GP Mouza-Bhandera, JL No-82 starting Dag No388,Ending -560 under Kandi Block | 06.05.19 01.05.19 | Kandi | 100% | 15.39456 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road starting from Bimal Rajbanshi house to Petenda Kalitala via Dighir ghat at Gobarhati village under Gokarna-II GP Mouza-Gobarhati, JL No-34 starting Dag No-918 via 1134 Ending-626 | 27.04.19 06.04.19 | Kandi | 100% | 18.47264 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Jibanti Sherpur pucca sasta near Jiadara Bus stoppage to Dhulauridanga village under Mahalandi-II GP Mouza-Jiadara, JL No-34 starting Dag No-502,Ending-01 under Kandi Block | 06.05.19 04.05.19 | Kandi | 100% | 14.7666 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Saifuddin Sk house towards Bahas Sk house via Kasem Sk house at Village-Surkhali under Sadal GP in Khargram Block | 27.04.19 | Khargram | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Motin Momin house towards Abdus Salam land at village Nagar under Kirtipur GP in Khargram Block | 01.05.19 28.05.19 | Khargram | 100% | 8.19421 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Bhadur house towards Durga Mandir at village Simuliapara under Eroali GP in Khargram Block | 08.05.19 | Khargram | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Osman Sk house towards Saru Sk house via main road Transmiter flood shelter at village-Fokirpara under Balia GP in Khargram Block | Khargram | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Bullah Pilling of Jatarpur village Rashidapukur Uttat & Paschim side under Eroali GP in Khargram Block | 28.04.19 24.05.19 | Khargram | 100% | 5.58368 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Reajuddin Haji's house towards Fajlu house on Earthen Road under Mouja Mahishasthal under Nashipur GP in Lalgola Block | 20.04.19 16.04.19 | Lalgola | 100% | 9.01471 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road Nimtala more towards Shamserpur Transformer at mouja Goneespur under Dewansarai GP in Lalgola Block | 05.05.19 10.04.19 | Lalgola | 100% | 8.12787 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC Road from Enamul' Fram towards at Tentuliapara mouja Paharpur under Paharpur GP in Lalgola Block | 26.04.19 10.04.19 | Lalgola | 100% | 7.51977 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Patal's house to Kudus' house at Tentuliaoara mouja Paharpur under Paharpur GP in Lalgola Block | 26.04.19 25.04.19 | Lalgola | 100% | 8.3294 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from BSF road towards Enarul Hoque house mouja Sabdalpur under Manikchak GP in Lalgola Block | 28.04.19 | Lalgola | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Umar Fatehpur ICDS to Rafikul SK house under Jasaitala GP in Lalgola Block | 29.04.19 17.04.19 | Lalgola | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road form Bramhatala Sonatan Biisws' house towards PNL road under Dahapara GP in Msd-Jiaganj Block | 25.04.19 18.04.19 | Msd-Jiaganj | 100% | 8.35504 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Pravat Chakroborty's house towards PNL Road Don Bosco under Mukundobag GP in Msd-Jiaganj Block | 01.05.19 28.04.19 | Msd-Jiaganj | 100% | 7.92608 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Improvement of Pitch road from Pwd Road to Sericulture road to Ransagar Mathpara under Kapas danga GP in Msd-Jiaganj Block | 07.05.19 | Msd-Jiaganj | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Abdul's Land towards Samsul Swallo Kumirdaha under Tentulia GP in Msd-Jiaganj Block | 08.05.19 20.04.19 | Msd-Jiaganj | 100% | 8.96001 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Hulaspur Saju Mondal house towards Sadek Saha house at Hulaspur in Dangapara GP under Msd-Jiaganj Block | 27.04.19 31.03.19 | Msd-Jiaganj | 100% | 9.63026 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Satkari Khan house to Khudu house under Natungram GP under Msd-Jiaganj Block | 27.04.19 18.04.19 | Msd-Jiaganj | 100% | 8.73145 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Panchgram Uttar more Amtala towards Panchgram Uttar more P.N.L road via Allahabad Bank unde Panchgram G.P in Nabagram Block | 05.05.19 | Nabagram | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of Cement concrete road from Hatu Sk house to Abdus Sobhan Sk house at Kochubari village under Rasulpur GP in Nabagram Block | 27.04.19 | Nabagram | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of pitch road from NH-34 to Korjora pitch road via Provarani College under Nabagram GP in Nabagram Block | 08.05.19 | Nabagram | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Nandalal para to Khajuria village under Narayanpur G.P in Nabagram Block | 05.05.19 | Nabagram | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Trimohini High Madrasha (H.S) pitch rasta towards Alampur Durga Mandir mouza-Ramnachandpur & Raipur under Kedarchandpur-II GP in Nowda Block | 28.04.19 27.05.19 | Nowda | 100% | 8.88121 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Raipur Nowpara Manik Chand house towards Mujam Sk house under Raipur GP in Nowda Block | Nowda | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Kamarul Khan house to Niyaj house via Jalil Khan house under Nowda GP in Nowda Block | Nowda | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of drain Madhupur Gholdoba Bus-Stop to Mannan house at Madhupur GP under Nowda Block | 29.04.19 | Nowda | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of drain Kamadpur caneel to Chhatunara road under Bali-II GP in Nowda Block | 02.05.19 | Nowda | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of pitch road from Bajpayee Bakultala towards Sabdanagar Busstand under Raipur GP in Nowda Block | Nowda | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Const of CC road from the house of Nurul Hoda towards the house of Abdulla Jarur Village under Jarur GP mouja Jarur Plot No 1012 in Raghuanthganj-I Block | 27.04.19 18.04.19 | Raghuanthganj-I | 100% | 7.99448 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Cont of CC road from the NH34 towards the house of Anarup Mondal at Mangal jone village under Kanupur GP plot no 435 468 in Raghunathganj-I Block | 08.05.19 18.04.19 | Raghuanthganj-I | 100% | 7.19253 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Const of CC road from the house of Chure Murmu towards the house of Nandalal Murmu at Dakshinpara village under Mirjapur GP mouza Dakshinpara in Raghunathganj-I Block | 28.04.19 13.04.19 | Raghuanthganj-I | 100% | 7.29896 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Const of CC road from the house of Ranjit Saha towards the Shanti more at Natunganj village under Raninagar GP under Raghunathganj-I Block | 28.04.19 27.03.19 | Raghuanthganj-I | 100% | 7.48347 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC Road from Bhairabtala Kalitala to Rasunpur Bridge more under Giria GP mouja Giria Dag No 1162 in Raghunathganj-II Block | 28.04.19 20.05.19 | Raghuanthganj-II | 100% | 15.65781 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from house of Soharab SK to Kali Mandir Under Jotkamal GP in Raghunathganj II Block | 27.04.19 31.03.19 | Raghuanthganj-II | 100% | 7.70335 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Aplex road to Manjur SK house mouja Donalia Badher Dhar under Sanmatinagar GP in Raghunathganj-II Block | Raghuanthganj-II | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Chaipara Badher Dhar to Shimultala nadir dhar Bablu SK house mouja Krishna shail under Sekhalipur GP in Raghunathganj II | 26.04.19 30.03.19 | Raghuanthganj-II | 100% | 7.19347 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Ekbar SK's house to Ainal Sk's house with guard wall at Kashiadanga mouja under Kashiadanga GP in Raghunathganj-II Block | 06.05.19 05.05.19 | Raghuanthganj-II | 100% | 8.0736 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Keshbanus' house towards NH-34[Talai] more including Guardwall of 170 Mtr.under Raghunathganj-II Block | Raghunathganj-II | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Jahirul SK's house to Yar Mohammad's house at Damodarpur village under Paharpur GP in Raninagar-I Block | 08.05.19 05.05.19 | Raninagar-I | 100% | 18.62334 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Improvement of Black to Road from Manwar Hossain 's house at Tenachuria Pith Road to Eserpara Prymari school under Islampur GP in Raninagar-I Block | Raninagar-I | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Daha pukur Dahakulpara to Eserpara Kabarasthan near Hajrat Sk' Mill at Islampur GP in Raninagar-I Block | 08.05.19 04.05.19 | Raninagar-II | 100% | 4.17677 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Ensar Ali house at Ramnagar Sarkarpara to Nurul Islam's house at Nayanshukpur under Kalinagar in Raninagar-II Block | 06.05.19 07.04.19 | Raninagar-II | 100% | 11.01308 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Yakub sk's house to Yusuf SK's house at Jinnatpara under Kalinagar GP in Raninagar-II Block | Raninagar-II | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Pitch Repair road fron Dhanirampur More to Bitch para to Saiful Islans Housh 1500 Mtr in Debipur G.P and Rajapur G.P Under Jalangi and Raninagar -II Block . | 06.05.19 | Raninagar-II | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Vurkunda pir Majar to Saorail Saheb' Brick field under Moregram G.P in Sagardighi Block | 07.05.19 06.05.19 | Sagardighi | 100% | 9.96499 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Mojibur Sk's Land at Canal to Hedayatulla's land with culvert at mouja Biprakali under Banneyesar GP in Sagardighi Block | 28.04.19 25.04.19 | Sagardighi | 100% | 4.8605 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC road from Sankadanga black top road to Durga Mandir via Sanat Mondal's house mouja Nowpara under Balia GP in Sagardighi Block | 07.05.19 08.04.19 | Sagardighi | 100% | 8.01305 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of of CC Road from Anekul Islam's house at Karaia at Jugor Idgaha Maidan mouja jugor under Harhari G.P in Sagardighi Block | 07.05.19 13.04.19 | Sagardighi | 100% | 7.77243 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Cons of CC Road from Nurujuddin Sk house towards Adibasi Beldanga village mouza Kanchia Bishundanga under Patkeldanga GP in Sagardighi Block | 08.05.19 | Sagardighi | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Bahilpara to Sahapur railgate via Ltor under Sagardighi Block | 08.05.19 | Sagardighi | WIP | 0.00 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of road from Majhidanga rail line towards Majhidanga Bakhalnadi,starting plot no-71,JL-172,Mouza-Plamda/Ending plot no-2306,JL-163/Mouza-Jadabpur under Sagardighi Block | Sagardighi | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC Road with Guardwall from Dilwar Hossain house to Anarul Hoque house at Shulitala Village under Kanchantala GP in Sameserganj Block | Sameserganj | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Const of CC Road from the house of Kuddus Ali to the house of Samjib Rabi Das via Dilip Mandal at village Antardweepa Mouja 69 Antardwipa under Bhasaipaikar GP Dag No 375 to 361 in Samserganj Block | Sameserganj | WIP | 0.00 | ZP | ||||||
2018-19 | 0000-00-00 | 0000-00-00 | Const of CC Road from Sitarampur Madrasha to the house of Saiful hoque (Matar more) at village Sitarampur under Dogachi Noapara GP in Samserganj Block | 27.04.19 28.03.19 | Sameserganj | 100% | 8.19266 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction CC Road from Shibpur Vanga Line (Chachanda GP) to Rajkumar Mondal (Pratapganj GP) house under Pratapganj GP in Samserganj Block | 20.04.19 10.04.19 | Sameserganj | 100% | 9.78584 | ZP | |||||
2018-19 | 0000-00-00 | 0000-00-00 | Construction of CC Road to Saifuddin house to Palash Master house under Chachanda GP in Samserganj Block | 27.04.19 02.04.19 | Sameserganj | 100% | 7.46086 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Cement Concrete Road from the Mahisasthali Culvart to the end of Mahisasthali village | 15.08.18 | B-Gola-I | WIP | 0 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of pitch road from Commander more towards Dihipara more under B-Gola-I Block | 29.04.18 18.10.18 | B-Gola-I | 100% | 24.38016 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Barianagar Singar Bagan more towards Dakshinsahar Jumma Masjid under Saralpur GP in B-Gola-II Block & Construction of road from Dakshinsahar Jumma Masjid towards Diarapara under Saralpur GP in B-Gola-II Block | 20.06.2018 | B-Gola-II | 100% | 62.71236 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of pitch road from Sayeedpur School more towards Dihipara under Kharibona GP in B-Gola-II Block | 13.05.18 02.12.18 | B-Gola-II | 100% | 28.97869 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Black top road from Topidanga High Madrasha to Faaridpur under Amdahara GP in B-Gola-II Block | 20.07.18 30.09.18 | B-Gola-II | 100% | 25.07393 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Gangapur Seru Sk's house towards Manjur Sk house and Ganga Talmandha pond towards Munjun Sk's house and Gangapur Talmandha Pond towards Ear Ali house under Beldnaga-I Block | 07.04.2018 | Beldanga-I | 100% | 16.77613 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Jorgacha culvert to Ayub Nabi house at Betberia under Chaintnyapur-I GP under Beldanga-I Block | 12.04.19 | Beldanga-I | 0 | ZP | ||||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of PCC road from Lal Mallick house towards Abol bepari house at Khagru para old Sarak under Mirzapur-I GP in Beldanga-I Block | 28.04.18 25.06.18 | Beldanga-I | 100% | 24.58316 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of PCC road from Dihipara Jafar Sk's house towards PMSGY road at Mahula-I GP under Beldanga-I Block | 29.05.2018 | Beldanga-I | 100% | 8.75283 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of PCC road with protective wall from Sargachi Mirzapurpara towards ICDS at Mahula-I GP under Beldanga-I Block | 25.05.2018 | Beldanga-I | 100% | 8.08756 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of PCC road from Gopinathpur Mia para Bahar Sk house towards Joy Narayan Rajjak house under Mohula-I GP in Beladanga-I Block | 29.04.18 28.06.18 | Beldanga-I | 100% | 17.73146 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Cement concrete road from taldanga kalimandir towards Tapan Roy house via house of Beauty Singha Roy at Taldanga under Saktipur G.P. | 02.04.18 24.07.18 | Beldanga-II | 100% | 16.98127 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Loknathpur Uttarpara Kader Ali Mollah house Foizole Mallick house plot no-762 under Sompara-I GP in Beldanga-II Block | 18.03.2018 | Beldanga-II | 100% | 12.8094 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Anando Halder house to Sardarpara road under Rampara-I GP in Beldanga-II Block | 16.05.2018 | Beldanga-II | 100% | 6.40047 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Politapara Mannan Farazi house to Aiyub Nabi house under Sompara-I GP in Beldanga-II Block | 26.04.2018 | Beldanga-II | 100% | 8.72519 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of High drain from Boliharpara Chandromohon pukur towards Rentu Sk Grill factory & Boliharpara eid haha moidane to Sukur Ali Sk houseunder Sompara-I GP in Beldanga-II Block (Phase-I) | 22.03.18 25.11.18 | Beldanga-II | 100% | 14.71571 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Sujapur Ajit Ghosh house's to Mandir under Ramnagar Bachara GP in Beldanga-II Block | 28.04.18 13.07.18 | Beldanga-II | 100% | 18.63224 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Surbastulla Sk house towards Golam Kibria house via Baro Namazipara Masjid under Sompara-II GP in Beldanga-II Block | 30.03.18 13.08.18 | Beldanga-II | 100% | 5.9089 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Gholla High Madrasha [Dag No-2001/Mouza-Gholla]to Karal Pukur via Saktipur Muchipara more [Dag No-799/Mouza-Saktipur] under Beldanga-II Block [Part-A+B] | 13.05.18 08.11.18 | Beldanga-II | 100% | 47.76728 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Constructiom of Cement Concrete from Falu Sk house to Rupchand Sk house under Dadpur GP in Beldanga-II Block | 25.04.2018 | Beldanga-II | 100% | 12.90679 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Constructiom of Cement Concrete from Alibpur ganga drar to Moglish pur Sawra tala under Kamnagar GP in Beldanga-II Block | 10.05.2018 | Beldanga-II | 100% | 17.99084 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Jhikra more to Jhikra Shibtala under Beldanga-II Block | 11.05.18 30.08.18 | Beldanga-II | 100% | 17.80925 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Improvement by concrete road Ramnagar Ferry Ghat approach road under Beldanga-II Block | 26.04.18 02.07.18 | Beldanga-II | 100% | 11.24991 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Garduair Goutam Saha shop to Narkel bari Manan Sk house under Beldanga-II Block | 11.05.18 14.10.18 | Beldanga-II | 100% | 20.35424 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Box culvert and concrete road road from Momin Sk house towards NH-34 road under Radhaghat-I GP in Berhampore Block | 20.07.18 28.09.18 | Berhampore | 100% | 26.45626 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Improvement of Kalikapur road by bituminous work from Tracker atand towards Madhupur culvert under Berhampore Block.Msd | 05.10.18 03.09.18 | Berhampore | 100% | 15.81273 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Guard Wall un between near Khagraghat Railway Gate(Berhampore Kandi Road) towards M.S.K $ Swamiji Vidyamandir School under Berhampore Block | 11.05.18 28.12.18 | Berhampore | 100% | 6.82535 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Maintance of CC road near Khagraghat Railway gate (Berhampore Kandi road) towards M.S.K & Swamiji Vidyamandir School under Berhampore Block | 13.05.18 09.12.18 | Berhampore | 100% | 34.23043 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Maintance of Karbala road from Panchanantala towards Cossimbazar Post office under Berhampore Panchayat Samiti | 26.04.18 06.07.18 | Berhampore | WIP | 6.18648 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Rafik Sk house to Sealmara Mondal para Jumma Masjiid with bamboo pilling under Radharghat-I GP in Berhampore Block | 26.04.18 15.06.18 | Berhampore | 100% | 9.0604 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road with side drain from the house of Gobardhan Ghosh towards Shamsundarpur Pry.School via Munsurpur Jr.Hogh School to Salamat Sk house under Sijgram GP in Bharatpur-I Block | 22.07.18 16.11.18 | Bharatpur-I | 100% | 15.89687 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Ghulhatia link pucca road to Kartick Ghosh house via Gorapar Graveyard at Raigram Dakshinpara under Bharatpur-II Block (Phase-I & II) | 11.05.2018 | Bharatpur-II | 100% | 47.3097 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of black top road from Ranipur towards Saidpara via Rayhat under Sahora GP in Burwan PS & Construction of black top road from Saidapur towards Ranipur via Rayhat under Sahora GP in Burwan PS | 31.04.2018 10.12.2018 | Burwan | 100% | 85.48176 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Black top road from Maliandi post office to Durmaghat via Pirtala under Sundarpur GP in Burwan Block | 29.04.2018 | Burwan | WIP | 0 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Nabapally to Tildanga pucca rasta via Ghunkia under Sahora GP in Burwan Block | 13.05.18 29.12.18 | Burwan | 100% | 36.55225 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Masdda towards Burwan Tantipara under Burwan Block | 11.05.18 12.03.19 | Burwan | 100% | 13.32666 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Harimati Pirtala to Morol Pukur Under Kharjuna GP in Burwan Block | 05.09.2018 | Burwan | 100% | 10.40824 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Sahadiar school more towards puratan canal under Garaimari GP in Domkal Block & Construction of road from puratan canal towards Karbala Maharamtala under Garaimari GP in Domkal Block and Construction of road from Maharamtal Karbala towards Nikhal Mia & Hakim Dr's house under Garaimari GP in Domkal Block | 30.03.2018 28.08.2018 | Domkal | 100% | 87.49742 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Tufan Mondal pukur near Bakshipur PWD road to Safikul Molla house under Domkal Block | 12.05.2018 | Domkal | WIP | 0 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Reparing of riding quality of road from SDO more to Godhanpara more (Phase-I) under Domkal Block | 13.05.2018 04.02.2019 | Domkal | 100% | 23.58376 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Black top road from Kedarnath Bridge to Nishindra Ferry Ghat under Farakka Block (Phase-I) Construction of Black top road from Kedarnath Bridge to Nishindra Ferry Ghat under Farakka Block (Phase-II) | 29.06.18 16.11.18 | Farakka | 100% | 50.5032 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Upgradation of road from Pachula village to Amtala High School via Anshar's Tea Shop under Immanagar GP in Farakka Block | 05.05.2018 | Farakka | 100% | 20.62764 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from the house of Umar Faruk (Khodabandpur Uttarpara) via Khodabandpur G.B.S Pry.School to Uttarpara Juma Masjid under Farakka Block | 13.05.2018 20.06.2018 | Farakka | 100% | 28.83261 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Shop of Motiur Sk towards Balidapukur culvert at mouza Kulgachi Jigree under Moheshpur GP in Farakka Block | 15.04.2018 | Farakka | 100% | 4.68959 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Cement concrete road from Choa Madhob halder House to Choa Khaspara Sadar Sk house under Choa GP under Hariharpara Block. | 25.05.2018 | Hariharpara | 100% | 13.40016 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Box culvert and concrete road from Kanchannagar house of Delsad Sk to Kaman Sk at Beharia GP in Hariharpara Block | 13.05.18 22.11.18 | Hariharpara | 100% | 26.64383 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Concrete road from bank of Pradip Danga Dighi's pitch rasta to Humayun Jakir Sk's house under Hariharpara Block | 04.05.18 20.06.18 | Hariharpara | 100% | 12.63134 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Rukunpur pitch road (near Mehebub house) to Magura Milk Co-Operative Society via Magura Club under Rukunpur GP in Hariharpara Block[Part-A+B] | 28.06.2018 | Hariharpara | 100% | 68.81314 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Box culvert & cement concrete road from Kanchannagar house towards Delsad Sk towards Kaman Sk at Beharia GP in Hariharpara Block | 13.05.18 07.12.18 | Hariharpara | 100% | 31.80164 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of PCC road from Kalaimuddin Sk towards Kanchan Pal's house via Jalangi School at Biswas para under Choapara GP in Jalangi Block | 25.08.18 24.08.18 | Jalangi | 100% | 20.98364 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of PCC road from Bajlu Sk house to Char Kakmari ICDS of Chak kakmari under Sahebnagar GP in Jalangi Block | 29.04.2018 02.08.2018 | Jalangi | 100% | 22.26867 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction black top road from M/S K.R Indian Gas Godown to Dighi in Mahalandi GP & Kumarsanda GP in Kandi Block & Construction of black top road starting from Jibanti Sherpur State Highway near Mahalandi Haqueshed Shop to M/S K.R Indian Godown in Mahalandi GP under Kandi Block | 03.05.18 10.10.18 | Kandi | 100% | 61.00739 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement road starting from Harinagar Kabarsthan to Harinagar Pry.School at Harinagar under Hizole GP in Kandi Block | 15.05.2018 | Kandi | 100% | 28.52188 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Improvement of road starting from Jibanti Kalitala (near PMGSY road) to Jibanti Halt Rail way station under Mahalandi-II GP (Phase-I) | 13.09.18 29.01.19 | Kandi | 100% | 34.66461 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of 3 Vent Box culvert (5.0 m X 5.0 m) at Canal near village Bagan Ghat in Hizole G.P,under Kandi Block.Msd | 16.02.19 WIP | Kandi | WIP | 19.14393 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Improvement of road starting from Hizole PMGSY road (near Gopal Nagar Folld Shellter) via Benipur to Amitya Police Fari at Amitya village at Hizole GP in Kandi Block (Phase-I) | 13.05.18 04.09.18 | Kandi | 100% | 32.78426 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Bibinagar Nimtala towards Ratanpur Pry.School via Gangarampur Club, Gangarampur Mosque and Naldwip Sub-Health centre under Margram GP in Khargram Block [Chanage 0 to 1350 mtrs.] & Construction of concrete road from Bibinagar Nimtala towards Ratanpur Pry.School via Gangarampur Club, Gangarampur Mosque and Naldwip Sub-Health centre under Margram GP in Khargram Block [Chanage-1350 to 1900.94 mtrs.] | 06.02.18 06.04.19 | khargram | WIP | 55.39735 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Girder Bridge over Gobranala at Chowki Ghat under Kapasdanga G.P in Msd-Jiaganj Block (Part-A+B) | 27.05.18 | Msd-Jiaganj | WIP | 0 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Repair & Improvement of Black top road from Amaipara more towards Palasbati Ghat under Bahadurpur GP in Msd-Jiaganj Block | 13.05.18 23.06.18 | Msd-Jiaganj | 100% | 31.0446 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of pitch road from Sannashitala Bus-Stop to Palasbati Ghat under Bahadurpur GP in Msd-Jiaganj Block | 13.05.18 21.06.18 | Msd-Jiaganj | 100% | 36.64421 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from main road near Diamond Club in the east to the north-west corner of Ranibhawani Dighi in the west near Lalipali mouza under Msd-Jiaganj Block | 30.05.2018 | Msd-Jiaganj | 100% | 30.99742 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Sodpur Bus-Stand towards Bakipur under Rasulpur GP in Nabagram Block | 18.06.18 | Nabagram | 100% | 36.38199 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from house of Susanto Hazra in village Dafarpur towards NH-34 including U.C pilling under Shibpur GP in Nabagram Block | 29.05.18 25.05.18 | Nabagram | 100% | 22.68424 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Kushmore road towards Kusmore village under NabagramGP in Nabagram Block | 11.05.18 26.05.18 | Nabagram | 100% | 13.07942 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of guard wall beside Rahamat Karigar's house and road at Patkabari Amir Mondal house to Damdama Faizuddin Master house under Nowda Block | 28.05.08 31.07.18 | Nowda | 100% | 40.95378 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Kodalkati Nijamuddin Biswas house to Abdul Bari Mondal's house under Nowda | 30.05.2018 | Nowda | 100% | 26.93864 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Daddamua Baro Masjid to Edgahtala via Baro Masjid towards Alim Sk house Daddama Khalpara under Chandpur GP in Nowda Block | 13.05.18 09..04.19 | Nowda | 100% | 38.63487 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Chandpur Anarul Halsuna house towards Chandpur Najlu Master house under Chandpur GP in Nowda Block | 13.05.18 29.12.18 | Nowda | 100% | 25.64489 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of 5.00 M.X 4.00 M. Box culvert near Mahammadpur Joler math culvert under Chandpur GP in Nowda Block | 31.12.18 26.04.19 | Nowda | 100% | 16.35858 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Bundai Nagar Pry.School towards Alampara Hazrapara Pry,School Mouza-Bundainagar J.L No-16 under Raipur GP in Nowda Block (Part-A+B) | 28.05.18 28.10.18 | Nowda | 100% | 55.45729 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road at Mirzapur under Raghunathganj-I Block | 15.05.2018 | Raghunathgani-I | 100% | 25.49685 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from the house of Jahangir Sk at Ramjanpur village towards Chuadanga Pry.School under Jarur GP in R-Ganj-I Block | 14.05.2018 | Raghunathgani-I | 100% | 29.79241 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Kanupur Bank more to Gadaipur village to NH-34 under Kapasdanga GP in R-Ganj-I Block | 13.05.18 26.10.18 | Raghunathgani-I | 100% | 39.9553 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Reparing road from Bhairabtala Tenur more to Momintala via Chandpur more via Nabakumar Master's house under Giria GP in Raghunathganj-II Block | 11.05.2018 | Raghunathgani-II | 100% | 18.78107 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Constructin of road from Bhairabtola Kalimandir towards Fatallapur Milan Mandir of Giria GP under R-Ganj-II Block | 13.05.18 10.05.18 | Raghunathgani-II | 100% | 27.21665 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Cnstruction of CC road from Setar Sk house towards Bhakti house with guard wall (300 mtr.) under Teghari GP in R-Ganj-II Block | 11.09.18 04.09.18 | Raghunathgani-II | 100% | 21.56987 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Kashiadanga GP Office to Akhtar India Gas Office & Concrete road from Kadomtala to Doulat Biswas house under Dighir Pahar village at Kashiadanga GP in R-Ganj-II Block | 03.05.2018 | Raghunathgani-II | 100% | 11.79224 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Badupur-Mahalderpara PMSGY road to Trimohini Bottala more under Kashiadanga GP in R-Ganj-II Block | 09.05.2018 | Raghunathgani-II | 100% | 15.88224 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Goas Kalikapur High School near PMGSY road to the house of Habib at Goas Sarkarpara under Raninagar-I Block | 12.05.2018 | Raninagar-I | WIP | 0 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from house of Nabakumar Halder to house of Chaya Ghosh at Halderpara at Katlamari-I GP in Raninagar-II Block | 12.05.2018 | Raninagar-II | WIP | 0 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Sekhpara Kaharpara Stat Highway Malipar Surjo Saha house more to Jhawbaria Katlamari road Malipara Pry.School more under Raninagar-II Block(Phase-I & II) | 29.05.2018 20.02.2019 | Raninagar-II | 100% | 51.16576 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Jumma masjit to Hazipara village at Azmali delear via Jumma masjit to Dakshinpara under Bannyeswar GP in Sagardighi Block | 03.26.2018 | Sagardighi | 100% | 29.10928 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Telandighi pitch rasta to Fulban pitch rasta under Sagardighi GP in Sagardighi Block (Phase-I) & Construction of cement concrete road from Telandighi pitch rasta to Fulban pitch rasta under Sagardighi GP in Sagardighi Block (Phase-II) | 05.05.2018 | Sagardighi | 100% | 57.63692 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from Iswarbati ICDS centre to Nawpara pitch road under Sagardighi & Balia GP in Sagardighi Block | 10.05.18 | Sagardighi | 100% | 26.65318 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from NH-34 to Jalbandha Gram to Hossain under Bokhra-I GP in Sagardighi Block | 29.05.18 30.01.19 | Sagardighi | 100% | 50.86301 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of Cement Concrete Road from the Baharagachi to the Fulandar Primary School at Gaginagar Malancha GP | 22.06.18 15.06.18 | Samserganj | 100% | 36.71503 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of P.C.C. road from Malancha Adhir Pramanik house to Fider canel ghat at Malancha GP under samserganj | 04.05.2018 | Samserganj | 100% | 12.51109 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from the house of Ratan Halder to the house of Nanigopal Das at Hasimpur under Nimtita GP in Samserganj Block | 29.04.18 13.06.18 | Samserganj | 100% | 22.42168 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Hazi Raisuddin house to Rafikul Islam house under Tinpakuria GP in Samserganj Block | 25/04/2018 | Samserganj | 100% | 18.73178 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Ashraful Sk house to Gobindapur village Kabarsthan under Samserganj Block | 07.07.18 18.04.19 | Samserganj | 100% | 20.94668 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Moka Sk house to Firuk Sk house under Samserganj | 23.04.2018 | Samserganj | 100% | 9.14502 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Reparing of black top road from Bansabati Raj Bonsi para to Sarbasri Ghat (Hilora) under Bangsabati GP in Suti-I Block (Phase-I) & Reparing of black top road from Bansabati Raj Bonsi para to Sarbasri Ghat (Hilora) under Bangsabati GP in Suti-I Block (Phase-II) | 03.11.18 26.10.18 | Suti-I | 100% | 60.38821 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of concrete road from K.B Road Ramdova Bus-Stand to Ramdova MSK 1No (3.00M) span culvert at Suti-I Block (Phase-I) & Construction of concrete road from K.B Road Ramdova Bus-Stand to Ramdova MSK 1No (3.00M) span culvert at Suti-I Block (Phase-II) | 08.05.18 03.05.18 | Suti-I | 100% | 65.76903 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Renovation of road from NH-34 to AligarCamp& Ahiran Police outpost under Suti-I Block | 02.05.2018 | Suti-I | 100% | 19.15361 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of KB road to Gaighata to Pancgachi Ferry ghat under Harua GP in Suti-I Block (Phase-I) & Construction of KB road to Gaighata to Pancgachi Ferry ghat under Harua GP in Suti-I Block (Phase-II) and Construction of cement concrete road from house of Mortuz Sk to Pancgachi Ferry ghat via Idgah under Harua GP in Suti-I Block | 18.05.18 10.10.18 | Suti-I | 100% | 73.04482 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from the house of Sultan Sk to house of Late- Giasuddin of village Nayabahadurpur under Nurpur G.P in Suti-I Block | 12.04.19 | Suti-I | WIP | 0 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from the Ahiran Hat towards Ahiran Hospital at Ahiran village under Ahiran GP in Suti-I Block | 29.04.18 14.10.18 | Suti-I | 100% | 12.82414 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of CC road from K.B road Kalitala to Ruplal Ghosh house under Banshabati GP in Suti-I Block | 23.04.2018 | Suti-I | 100% | 14.46947 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of road from Ahasan Master house to Hapania Jakir Hossain B-Ed College under Jagtai-II GP in Suti-II Block | 29.05.2018 21.05.2018 | suti-II | 100% | 52.1372 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of cement concrete road from Madana Station Rail Gate to Mission more under Laxmipur GP in Suti-II Block | 08.05.2018 | suti-II | 100% | 9.75403 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Reparing of road from Srirampur Shive Mandir to Dhalaram Chandrapur [house of Rup Chand Das] under Suti-II Block | 25.08.2018 20.09.2018 | suti-II | 100% | 22.50307 | ZP | |||||
2017-18 | 0000-00-00 | 0000-00-00 | Construction of CC road from Alkesh house to Joleman house at Ullapara in Umrapur GP under Suti-II Block | 05.08.2018 | Suti-II | 100% | 37.99995 | ZP |